Projects

Rockies Power Reserve is currently developing the Grizzly BESS, a grid-scale battery storage project located in Drayton Valley, Alberta, scheduled to come online in 2028. Revenue and operational learnings from Grizzly will directly fund the simultaneous construction of two additional sites – Big Horn BESS and Grey Wolf BESS – bringing all three facilities into commercial operation by 2030. Together, this Alberta-owned trio will deliver over 100 MW / 400 MWh of fast-response, emissions-free energy storage, turning Alberta’s abundant wind resource into reliable, around-the-clock renewable power for the province.

Grizzly Battery Energy Storage Site

20MW/80MWh, online by 2028. Located in Drayton Valley. Currently in development.

Big Horn Battery Energy Storage Site

40MW/160MWh, planned for 2030.

Grey Wolf Battery Energy Storage Site

40MW/160MWh, panned for 2030.

Total Capacity

Total capacity of 100MW/400MWh planned for 2030